Rosemount Bible Church
Rosemount Bible Church Read More »
MAIN CHALLENGE: This project of an internal staircase for the exclusive use of Fiera Capital in an existing 20-storey building in Downtown Montreal required a close coordination with the structural engineers, a meticulous design of the construction details and an in-depth study of fire protection requirements
PROJECT MANAGEMENT: Lakeshore Construction SERVICES PROVIDED: Interior and exterior survey Preliminary sketches for roofing outlines Coordination of interior changes in progress with the designer Permit application process and CCU presentations Permit plans for demolition and construction Development of a structural strategy with the engineer for the extension and its roof Work supervision and site visits
PROJECT MANAGEMENT: Partnership with Les Constructions L&G Tardif and René Desjardins SERVICES PROVIDED: Site study (sun path and orientation) Understanding of the Charpente LG structural system and research for exterior finishes Advanced preliminary drawings for permit Coordination with René Desjardins for interior finishes Work supervision when needed SCOPE OF WORK: Two-storey model home with open
Sainte-Agathe Getaway Read More »
PROJECT MANAGEMENT: Construction Albert Jean SERVICES PROVIDED: Meetings with the city and permit application process Interior design with Léonie-Emmanuelle Duperré Demolition and construction drawings Coordination of engineers and other participants Work supervision, shop drawing revision and weekly site visits SCOPE OF WORK: Replacement of the original windows with historical reproductions New staircase with wooden steps,
Côte-Sainte-Catherine Residence Read More »