Benedek Integrated Laboratories, Engineering

LOCATION

CONSTRUCTION PERIOD

PROJECT CATEGORY

AREA

Description

Transformation of the 5th floor of the Macdonald Engineering Building into a dynamic space with integrated offices and laboratories unifying the Department of Environmental Engineering

CONSTRUCTION CONTRACT:

Traditional Contract – invitation to tender

SERVICES PROVIDED:

  • Photo survey
  • Construction Code analysis
  • Meetings with the Ministry of Culture and Communications and the city
  • Planning concept inspired by the field of research itself
  • Estimated budget
  • Management of the tender process, analysis of the submitted bids and recommendations
  • Plans and specifications for tender and construction
  • Consolidation of mechanical systems, new and existing
  • Interior design and specialized custom furniture
  • Contract administration
  • Work supervision and site monitoring

SCOPE OF WORK:

  • Demolition of the 5th floor offices to add to the existing laboratories
  • New closed and multifunctional open-plan offices and integrated laboratories with their adjacent preparation rooms
  • Layers of glass panels separating the spaces and increasing the diffusion of natural light and knowledge
  • Custom furniture design for specialized equipment
  • Centralization of electromechanical systems to manage energy recovery ensuring financial and ecological savings over the long term
  • Integration of a new high-efficiency air conditioning unit on the slopped roof of this heritage building

MAIN CHALLENGE:

Multiple changes to the scope of work and project budget at various stages, even during construction